Summit X250e Series Switches
Summit Family Switches Hardware Installation Guide
423
Inrush current
20 A at 48 V
, 30 A at V
Power supply cord type
DC
Power supply input socket
TYCO 206061-1
Power cord input plug
TYCO 206060-1
Power cord wall plug
None provided
Power supply cord gauge
14 AWG (2.0 mm
2
)
Efficiency
78%
Heat dissipation
31 W (105.8 BTU/hr)
Power consumption (Watts)
31 W (105.8 BTU/hr)
Summit X250e-48t Power
Operational voltage range
90 to 264 V
Nominal input ratings
100 to 240 V
, 50/60 Hz, 1.0 A
Input current
0.6 A @ 115 V
(low-line)
0.3 A @ 230 V
(high-line)
Line frequency range
47 to 63 Hz
Inrush current
30 A @ 115 V, 60 A @ 230 V
Power supply cord type
AC
Power supply input socket
IEC 320 C14
Power cord input plug
IEC 320 C13
Power cord wall plug
Refer to
“Power Cord Requirements for AC-Powered Switches and
AC Power Supplies” on page 500
.
Power supply cord gauge
18 AWG (0.75 mm
2
) up to 6 feet or 2 meters
or
16 AWG (1.0 mm
2
) over 6 feet
Efficiency
83% with 60% to 100% load
Heat dissipation (Watts)
51 W (174 BTU/hr)
Power consumption (Watts)
51 W (174 BTU/hr)
Summit X250e-48p Power
Operational voltage range
90 to 264 V
Nominal input ratings
100 to 240 V
, 50/60 Hz, 5.5 A
Input current with PoE full load
4.5 A @ 115 V
(low-line)
2.25 A @ 230 V
(high-line)
Input current without PoE
0.75 A @ 115 V
(low-line)
0.5 A @ 230 V
(high-line)
Line frequency range
47 to 63 Hz
Inrush current
30 A @ 115 V, 60 A @ 230 V
Power supply cord type
AC
Power supply input socket
IEC 320 C14
Power cord input plug
IEC 320 C13
Power cord wall plug
Refer to
“Power Cord Requirements for AC-Powered Switches and
AC Power Supplies” on page 500
.
Table 81: Summit X250e Series Switch Technical Specifications (Continued)
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...