4.2. MAINTENANCE
CALENDAR
By its design, the MP101M requires very limited maintenance. However, the unit must be regularly
serviced to ensure proper performance over time. The routine maintenance schedule shown below is
an example, and this schedule can vary according to operating conditions.
Nature of operations
Periodicity
Sheet N°
–
Check of Picolino pump assembly
1 year
4.3.1
–
Check of KNF pump assembly
1 year
4.3.2
–
Sampling heads cleaning
1 month
4.3.3
–
Multiplexer (MUX) signals verification
3 months
4.3.4
–
Replacement of filter ribbon
1 to 3 years
4.3.5
–
Verification of pressure exerted on the filter
1 year
4.3.6
–
Flow rate and leak rate tests
3 months
4.3.7
–
Calibration of sampling flow rate
6 months
4.3.8
–
Beta gauge calibration
6 months
4.3.9
–
Contamination test
1 month
4.3.10
–
Beta gauge check (gauge test, mass test)
6 months
4.3.11
–
Verification / Replacement of T°C and RH sensors
6 months
4.3.12
4.3.
MAINTENANCE OPERATION SHEETS
As indicated in the previous page:
WARNINGS
–
Refer to chapter 0, safety guidelines section, pages 0-10 to 0-18.
Summary of Contents for MP101M
Page 8: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 0 8 Page intentionally blank...
Page 114: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 3 58...
Page 131: ...Duplication prohibited MP101M EnvironnementS A 4 9 SEPTEMBER 2013...
Page 145: ...Duplication prohibited MP101M EnvironnementS A 4 23 SEPTEMBER 2013...
Page 163: ......
Page 184: ...EnvironnementS A ESTEL Board Duplication prohibited JUNE 2009 18 Page intentionally left blank...