![Dräger Julian Operating Instructions Manual Download Page 43](http://html.mh-extra.com/html/drager/julian/julian_operating-instructions-manual_2526787043.webp)
Display (example):
A check mark (
✓
) indicates that the respective test point
has been completed successfully.
The clock symbol
u
u
u
u
indicates the test stage is currently
in progress.
The system compliance and the leakage of the breathing
system and breathing circuit are determined by Julian in
the self test.
Depending on the patient circuit used, system
compliance is 5 to 6 mL/cmH
2
O.
The system will tolerate leaks up to 150 mL/min at
30 cmH
2
O.
For leaks of more than 150 mL/min:
●
Check patient circuit and repeat leak test.
After the self test, Julian switches to standby.
Preparation
Checks of Readiness for Operation
Operating Instructions Julian SW 3.n
43
Self-test
electronics
freshgas
mixer
ventilator
system
compliance
5.00 mL/mbar
leakage
✓
✓
✓
16 mL/mbar
cancel
test
72
Summary of Contents for Julian
Page 1: ...Julian Anesthesia Workstation Operating Instructions Software 3 n XXXX ...
Page 3: ...XXXXXXX ...
Page 6: ...Operating Instructions Julian SW 3 n 6 This page intentionally left blank ...
Page 16: ...Operating Instructions Julian SW 3 n 16 This page intentionally left blank ...
Page 64: ...Operating Instructions Julian SW 3 n 64 This page intentionally left blank ...
Page 136: ...Operating Instructions Julian SW 3 n 136 This page intentionally left blank ...
Page 144: ...Technical Data APL Valve Characteristics 144 APL Valve Characteristics ...