21
CTC EcoZenith i360
5.9.1
5.9.2
5.9.3
5.9
Fill the heating circuit
Fill the heating circuit
5.9.1
Open the filling valve and fill the heating system.
5.9.2
Turn the safety valve to release air more quickly during filling; close the
filling valve when the system is full.
5.9.3
Check the manometer for a filled cold system (approx. 1 bar or 0.2–0.3
bar above the pre-pressure on the expansion tank).
Low Model
Summary of Contents for EcoZenith i350 L 1x230V
Page 3: ...162 505 77 1 2020 09 15 Installation and Maintenance Manual CTC EcoZenith i360 ...
Page 127: ...127 CTC EcoZenith i360 ...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......