RESERVED TO THE INSTALLER
CHECK TO BE CARRIED OUT WHEN THE INSTALLATION IS COMPLETE
1. CHECKING CORRECT INSTALLATION AND SEALING CAPACITY OF SCREW SECURING LIFT TO FLOOR
2. CHECKING CORRECT ELECTRIC HOOK-UP (ACCORDING TO STANDARDS)
3. CHECK OF CORRECT OPERATION (ACCORDING TO MANUAL)
4. CHECK FOR CORRECT EMERGENCY PUSH-BUTTON OPERATION
5. CHECK FOR MAX HEIGHT MICRO-SWITCH OPERATION
6. CHECK FOR MIN HEIGHT MICRO-SWITCH OPERATION
7. CHECK FOR SAFETY MICRO-SWITCH OPERATION TO PREVENT
ACCIDENTAL CARRIAGE MISALIGNMENT
8. CHECK FOR SMOOTH MOVEMENT AND LUBRICATION (GREASE) OF ROPE OF CARRIAGE MISALIGNMENT
SAFETY DEVICE
9. CHECK FOR CORRECT TENSION AND LUBRICATION (GREASE) OF DRIVING CHAIN AND PINIONS
10. CHECK FOR CARRIAGE GUIDE SLIDER LUBRICATION (GREASE)
11. CHECK FOR ARM-LOCK CORRECT ENGAGEMENT
12 CHECK FOR FOOT GUARDS CORRECT ASSEMBLY
13. CHECK FOR DRIVING BELT CORRECT TENSION
14. FULL-LOAD LIFT TESTING
15. CHECK OF LABEL APPLICATION ACCORDING TO DIAGRAM
16. CHECK FOR DOCUMENTS (instruction manual, Declaration of Conformity and inspection records)
17. TRAINING OF THE PERSONNEL AUTHORISED TO USE THE LIFT
18. INSPECTION RECORDS FILLING OUT
LIFT MODEL......................................................................................... SERIAL NO.........................................
NOTE
Firma Tecnico installatore
Firma cliente
DATE
______________/_____________/________
User
Stamp and Signature
Installer
Stamp and Signature
Summary of Contents for ERCO 3222N CEL
Page 2: ......
Page 8: ...8 1 2 DIMENSIONI INGOMBRO 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Page 12: ...12 POSIZIONE OPERATORE 1 6 ZONE A RISCHIO Fig 7 700 700 5000...
Page 16: ...16 Fig 16 5 6 7 2 4 3...
Page 31: ...31 9 0 SCHEMA ELETTRICO...
Page 32: ...32...
Page 33: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Page 36: ......
Page 42: ...8 1 2 OVERALL DIMENSIONS 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Page 46: ...12 700 700 5000 POSITION OPERATOR 1 6 HAZARDOUS AREAS Fig 7...
Page 50: ...16 Fig 16 5 6 7 2 4 3...
Page 65: ...31 9 0 ELECTRONIC CIRCUIT BOARD DIAGRAM...
Page 66: ...32...
Page 67: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Page 70: ......
Page 76: ...8 1 2 DIMENSIONS D ENCOMBREMENT 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Page 80: ...12 700 700 5000 POSITION OPERATEUR 1 6 ZONES A RISQUE Fig 7...
Page 84: ...16 Fig 16 5 6 7 2 4 3...
Page 99: ...31 9 1 SCHEMA CARTE ELECTRONIQUE...
Page 100: ...32...
Page 101: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Page 104: ......
Page 110: ...8 1 2 ABMESSUNGEN 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Page 114: ...12 700 700 5000 POSITION BEDIENER 1 6 GEFAHRENBEREICHE Abb 7...
Page 118: ...16 Abb 16 5 6 7 2 4 3...
Page 133: ...31 9 1 SCHEMA DER PLATINE...
Page 134: ...32...
Page 135: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Page 138: ......
Page 144: ...8 1 2 DIMENSIONES TOTALES 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Page 148: ...12 700 700 5000 POSICI N OPERADOR 1 6 ZONAS EN RIESGO Fig 7...
Page 152: ...16 5 6 7 2 4 3 Fig 16...
Page 167: ...31 9 1 ESQUEMA TARJETA ELECTR NICA...
Page 168: ...32...
Page 169: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Page 172: ......
Page 173: ......