INSTALLATION AND SETUP
CP2000-X User Manual
2-25
020-100031-01 Rev . 1 (03-2009)
Do not connect the ballast to AC unless the projection head and ballast are already
connected to each other, otherwise the exposed live ends of the heavy ballast cables
could be a serious hazard.
WARNING
Connect the ballast to the projector
FIRST
, and then connect to AC.
AC power levels vary from
region to region throughout
the world, with 400 VAC
common in some countries
(such as those in Europe and
Asia), and 200 AC common
elsewhere (such as in North
America and Japan). To
accommodate both
possibilities, the ballast
includes an internal
Input
Power Range Switch
for
toggling to the level of AC
available at the installation
site, i.e. either 200 or 400
VAC. The line cord plug
must also match.
From the factory, the ballast
switch and line cord are both
set for 200 VAC use.
Used/rented ballasts shipped
from other installation sites
may be set to either,
depending on where they
were last used—check the
status of the line cord plug
and switch before attempting
to connect to AC. See
instructions below (Figure
2.29.).
WARNING
Check the plug and internal switch before connecting to
AC. Qualified electrical technician required.
1.
A visual inspection of the plug can indicate 200 or 400 VAC status. Modify as
necessary for your site—as a delta load with safety ground, the plug has no
neutral.
5.
Remove the ballast cover to access and read the
Input Power Range Switch
.
6.
Toggle the switch
left
for use with 200 VAC supplies, or toggle
right
for 400
VAC supplies.
7.
Attach the ground lug to Earth Ground.
2.7
Connecting the
Ballast
Configuring the Ballast
For
Incoming AC
Figure 2.29. Setting Up the 7kW Ballast
Summary of Contents for CP2000-X
Page 1: ...CP2000 X U S E R M A N U A L 020 100031 01...
Page 2: ......
Page 42: ......
Page 102: ......
Page 112: ......
Page 130: ......
Page 135: ...SPECIFICATIONS CP2000 X User Manual 8 5 020 100031 01 Rev 1 03 2009...
Page 160: ......