INSTALLATION AND SETUP
CP2000-X User Manual
2-3
020-100031-01 Rev . 1 (03-2009)
HEAD-TO-BALLAST:
Connect all 4 ballast cables—two DC power cables, and 2
communication/control cables—between the projector rear and lamp ballast.
BALLAST-TO-AC:
See Figure 2.4. Connect the ballast’s integral line cord to your AC
supply (you may have to first modify the plug for the AC at your site).
NOTE:
Before connecting the ballast to AC, a qualified electrical technician must
make sure the ballast’s plug type and
Input Power Range Switch
match the line
voltage available at the site. Remove the lamp ballast cover to access the switch and
determine its setting—toggle
left
for
200 VAC
supplies, toggle
right
for
400 VAC
supplies (factory default=200 VAC). Modify the plug type as necessary—as a delta
load with safety ground, it has no neutral
.
Confirm that the ballast’s 3-phase status lights are on and that the adjacent
voltmeter displays an acceptable AC level for your ballast and region. See
Section 6, Specifications
for details. Then set the ballast AC on/off switch to ON
and listen for the internal cooling fan start-up.
NOTE:
There is no other indication of “ballast ON” status.
Figure 2.4. Ballast Connection and Power-up
Summary of Contents for CP2000-X
Page 1: ...CP2000 X U S E R M A N U A L 020 100031 01...
Page 2: ......
Page 42: ......
Page 102: ......
Page 112: ......
Page 130: ......
Page 135: ...SPECIFICATIONS CP2000 X User Manual 8 5 020 100031 01 Rev 1 03 2009...
Page 160: ......