A IR C O N D IT IO N IN G 1A-17
EVACUATING AND CHARGING PROCEDURES
A IR C O N D IT IO N IN G SYSTEM CAPACITY
Refrigerant
Charge
Oil
Charge
C 62
3 lbs. 4 o z.
10 oz.
C 62 & C 6 3
5 lbs. 4 o z.
10 oz.
IN S TA LLIN G CHARGING STA TIO N TO CHECK
SYSTEM OPERATION
1. The low pressure fitting is located on the connector
block (com pressor inlet line) and the high pressure fitting
on the m uffler (Fig. 24).
2. Install Gauge A dapters J-5420 and J-9459 o n to the high
and low pressure gauge lines o f the Charging S tation.
3. With the engine sto p p ed , rem ove the caps from the cored
valve gauge fittings.
4. Be certain all valves on Charging S tatio n are closed.
5. C onnect high pressure gauge line to high pressure gauge
fitting.
6. See Figure 21. T u rn high pressure co n tro l (2) one tu rn
counterclockw ise (o p en ). Crack open low pressure co n
trol (1) and allow refrigerant gas to hiss from low
pressure gauge line for th ree seconds, then connect low
pressure gauge line to low pressure gauge fitting.
7. S ystem is now ready for purging or perform ance testing.
PURGING THE SYSTEM
In replacing any o f the air conditioning com ponents the
system m ust be com pletely purged or drained o f refrigerant.
The purpose is to low er the pressure inside the system so th a t
a com p o n en t p art can be safely rem oved.
1. With engine sto p p ed , install high and low pressure lines
o f Charging S tatio n gauge set to the p ro p er high and low
pressure gauge fittings. (See “ Installing Charging S tation
to Check S ystem O p eratio n .”)
C A U T IO N :
Before installing lines, be sure th a t all
fo u r controls on the gauge set are closed.
2. D isconnect vacuum line a t Charging S tatio n vacuum
pum p and p u t th e line in a covered can as shown in
Figure 25.
N O T E : An em pty 3 lb. coffee can w ith a plastic
cover which has been cross-slit (X ed ), to allow hose
en try , works well fo r this purpose.
3. F ully open high (2) and low (1) pressure control valves,
and allow refrigerant to purge from system at a rapid rate
into the covered can.
4. Oil loss will be m inim al. It m ay be added to th e system
during evacuation as described later.
5. Tow ard th e end o f the purge stage, T ool J-24095 should
be flushed w ith refrigerant to elim inate possible c o n
tam ination.
a.
D isconnect refrigerant line a t supply tank.
b.
Flush T ool J-24095 by cracking open valve on
refrigerant ta n k . A fter, flushing for approxim ately
three seconds, close valve.
c.
T em porarily refasten th e tool.
d.
R econnect refrigerant line to supply tank.
MUFFLER
______
X —
COMPRESSOR
L O W PRESSURE
G A U G E
.C O N N E C T O R
BLOCK
C H A R G IN G S TA TIO N
C O NTROLS
Fig. 2 4 —Charging Schematic
Fig. 2 5 —Collecting Refrigerant Oil During Purging
C H E V Y V A N S H O P M A N U A L
Summary of Contents for BEAUVILLE SPORTVAN G10 SERIES
Page 1: ...10 30 SERIES CHEVY VAN SPO RTVAN SERVICE MANUAL C H E V R O L E T ST 140...
Page 70: ......
Page 192: ...C H E V Y V A N SHOP M A N U A L...
Page 203: ...VACUUM ADVANCE DIAGRAM FOR SMALL V 8 T C S SYSTEM EMISSION CONTROL SYSTEM 6T 11...
Page 256: ...M v m v y a v ilsrSf Meg jt C H E V Y V A N SHOP M A N U A L...
Page 262: ...FUEL TANK AND EXHAUST 8 6 Fig 9 Fuel Tank Vent Pipes C H E V Y V A N SHOP M A N U A L...
Page 264: ...FUEL TANK AND EXHAUST 8 8 C H E V Y V A N SHOP M A N U A L...
Page 276: ...Fig 14 T ilt Steering Column Explode...
Page 287: ...STEERING 9 21 Fig 33 Power Steering Pump Mounting C H E V Y V A N SHOP M A N U A L...
Page 290: ..._____________________________________ C H E V Y V A N SHOP M A N U A L...
Page 327: ......
Page 329: ......
Page 350: ...CHEVROLET SERVICE...