
7 - MAINTENANCE
Increase the track tension
Use the track adjuster grease fitting to adjust track ten-
sion. Adding grease will increase and tighten the track
deflection.
1. Pump
T
UTELA
M
OLY
G
REASE
GR-75
into the fitting
(3)
until deflection is correct.
2. In a straight path, the machine backward the length
of the track, and then forward the length of the track.
This will make the bottom of the track tight. Bring the
machine slowly to a stop. Do not use the brakes to
stop.
3. Check the deflection of the track again and adjust, if
necessary.
4. Repeat the procedure for the other track.
RAIL12DOZ0374AA
3
Decrease the track tension
WARNING
Flying object!
Always wear eye or full face protection when performing this procedure.
Failure to comply could result in death or serious injury.
W0313A
Decrease the track tension with an adjustment to the
ball check fitting.
The grease is UNDER EXTREME PRESSURE. Be
careful to back the ball check adjustment off SLOWLY.
Wear full coverage face protection before proceeding.
1. Use a
3/4 in
deep socket, and loosen the ball check
fitting SLOWLY about two turns. DO NOT remove the
adapter. Allow the grease to evacuate until the track
deflection is within the proper range.
2. When complete, re-torque the ball check to
59.7 -
74.6 N·m
(
44 - 55 lb ft
).
3. Move the machine backward the length of the track,
and then forward the length of the track. This will make
the bottom of the track tight. Bring the machine slowly
to a stop. Do not use the brakes to stop.
4. Recheck the track tension.
5. Repeat the procedure for the other track.
RCIL10CWL080AAL
4
7-88
Summary of Contents for 2050M
Page 22: ...1 GENERAL INFORMATION 1 16 ...
Page 106: ...4 OPERATING INSTRUCTIONS 21 Check the controls for correct operation 4 4 ...
Page 136: ...5 TRANSPORT OPERATIONS 5 14 ...
Page 196: ...7 MAINTENANCE RAIL13DOZ1597GA 1 7 40 ...
Page 197: ...7 MAINTENANCE RAIL13DOZ1598GA 2 7 41 ...
Page 198: ...7 MAINTENANCE RAIL13DOZ0003GA 3 7 42 ...
Page 264: ...7 MAINTENANCE RAIL12DOZ1024FA 2 7 108 ...