<Work procedure 2-9>
15 / 16
CAUTION:
Do not bend the center of the Process Unit Lower Stay [1] by holding it during the work.
When you touch the Lower Stay, hold the bases at both ends at the front and rear.
(Bending the Process Unit Lower Stay can cause damage to the ITB Unit.)
24) Replace the screw at the center of the Process Kit Lower Stay with a shorter screw (M4x5) [1].
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......