<Work procedure 2-13>
3 / 8
8) Open the intermediate transfer belt unit by approx. 90 degree, align the end of support shaft without
groove with the hole of intermediate transfer belt unit frame and align the other end of groove on support
shaft with the hole of intermediate transfer belt unit frame.
9) Close the intermediate transfer belt unit and hook it to the support shaft to stand it.
10) Remove the patch sensor unit.
11) Put a paper between the fixing feed unit and the ITB frame.
12) Remove the ITB.
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......