<Work procedure 2-12>
5 / 13
9) Remove the Drum Drive Unit.
-11 Screws (black TP)
CAUTION:
When removing the Drum Drive Unit, be sure not to damage (bend) the High Voltage Cable since it can be
easily disconnected.
Be sure to free the High Voltage Cable from the Edge Saddle after pulling out the Drum Drive Unit a little.
10) Lift the Drum Shaft Unit, and remove it from the host machine.
- 3 Screws
CAUTION:
When installing the Drum Shaft Unit and the Drum Drive Unit to the host machine, do not remove the 4
screws [1] securing the Process Unit on the front side of the machine.
FRONT
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......