< Work procedure 1-2>
6 / 19
10) When abnormality is found in the installation of the 2 Pressure Springs [1] of the Secondary Transfer
Roller such as being bent or not properly put on the mount of the spring, correct the deformation of the
springs or their installation. If abnormality is not solved, replace the faulty part.
11) Install the removed parts in reverse order.
Caution : Caution at installation
Make sure to install it in the position where the groove on the metal part of secondary transfer outer roller is
placed to the rear side of the secondary transfer outer unit.
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......