< Work procedure 1-4>
3 / 12
1) Open the Front Left Cover and the Front Right Cover.
Check the Pressure Spring of the Primary Transfer Roller for any abnormality. [C]
2) Remove Process Unit Cover.
3) Pull Out ITB Unit.
CAUTION:
Be sure to pull out the Fixing Feed Unit and ITB Unit to the position where latch is locked.
Reason: Disengagement between the Positioning Pin of the Secondary Transfer Outer Unit and Shaft
Support Member of the frame body of the ITB Unit becomes insufficient, and it may cause damage when
assembling the Intermediate Transfer Belt Unit.
4) Remove ITB Cleaning Unit.
5) Remove the connector.
6) Hold the grip and with opening the intermediate transfer belt unit, remove the support shaft.
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......