< Work procedure 1-4>
7 / 12
18) When abnormality is found in the installation of the 2 Pressure Springs [1] of the Primary Transfer Roller
such as being bent or not properly put on the mount of the spring, correct the deformation of the springs
or their installation.
19) If abnormality is not solved, replace the faulty part.
20) Install the removed parts in reverse order.
CAUTION:
Make sure to avoid the edge of the ITB displacement sensor lever from overlapping with the ITB at
installation.
CAUTION:
After assembly, execute ITB position adjustment in service mode.
(ITB position adjustment: COPIER > FUNCTION > INSTALL > INIT-ITB)
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......