<Work procedure 2-6>
10 / 12
20) Turn the lever [1] of the ITB to make a space [A] between the frame of the Intermediate Transfer Belt Unit
and the Steering Roller.
21) Remove the 2 screws [2] from the frame [1] of the Intermediate Transfer Belt Unit.
22) Remove the Slide Rail Holder (Rear) Unit [1] and the Steering Roller [2] from the frame [3] of the
Intermediate Transfer Belt Unit.
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......