<Work procedure 2-3>
8 / 8
13) Remove the secondary transfer inner roller.
14) Apply Super Lube (FY9-6005-000) about half the size of a rice grain (approx. 20 mg) to at least the half of
the circumference of a new Secondary Transfer Inner Roller at the two places [A] that are fitted in the
bearings.
15) Install the new Secondary Transfer Inner Roller in reverse order.
16) Install the removed parts in reverse order.
CAUTION:
Make sure to avoid the edge of the ITB displacement sensor lever from overlapping with the ITB at
installation.
17) ITB position shall be adjusted with a service mode whenever ITB pressure is released.
(ITB positioning adjustment : COPIER > FUNCTION > INSTALL > INIT-ITB)
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......