< Work procedure 1-2>
3 / 19
1) Open the front left cover and the front right cover.
Check the Fixation Screws of the ITB Positioning Shaft Supports for any looseness or
deformation, and check the ITB Positioning Shaft Supports and the pins of the ITB
Positioning Plate for any damage. [B]
2) Remove the process unit cover.
3) Remove the ITB positioning plate.
4) Check the 4 Fixation Screws [1] of the ITB Positioning Shaft Supports, the 4 ITB Positioning Shaft
Supports [2], and the 4 pins [3] of the ITB Positioning Plate for any abnormality.
5) If abnormality is found, replace the faulty part.
6) Install the removed parts in reverse order.
1) Open the Front Left Cover and the Front Right Cover.
Check the Fixation Screws of the Process Unit for any looseness. [C]
2) Remove Process Unit Cover.
3) Check the 4 Fixation Screws [1] of the Process Unit for any looseness.
4) If abnormality is found, replace the faulty part.
5) Install the removed parts in reverse order.
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......