<Work procedure 2-5>
7 / 16
22) Clean the both sides [A] of downstream sheet with lint-free paper.
23) If the 4 Push-on Rollers [A] are soiled, clean them with dry lint-free paper.
24) Install the removed parts in reverse order.
CAUTION:
If you have replaced the Developing Sleeve Unit with a new one, perform the following "
Measures after
replacement of the developing sleeve ".
Summary of Contents for imagePRESS 1135 Series
Page 2: ......
Page 5: ...Section 1 Uneven Density Image Shock Image ...
Page 6: ......
Page 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Page 92: ......
Page 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Page 94: ......
Page 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Page 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Page 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Page 242: ......