2010 Buell XB Models Service Manual
NOTES
TORQUE VALUE
FASTENER
3.4 ENGINE ROTATION FOR SERVICE, Assembly
40.7-44.7 Nm
30-33 ft-lbs
Center tie bar
3.6 ENGINE INSTALLATION, Assembly
40.7-44.7 Nm
30-33 ft-lbs
Center tie bar mount to engine fasteners
2.50 CHIN FAIRING, Installation
4-5.4 Nm
36-48 in-lbs
Chin fairing fasteners
5.7 DRIVE BELT AND IDLER PULLEY, Idler Pulley
Installation/LOCTITE 271 (red)
4-5.4 Nm
36-48 in-lbs
Chin fairing fasteners
1.9 CLUTCH/TRANSMISSION/PRIMARY
FLUID, Adjustment
13.6 Nm
120 in-lbs
Clutch cable adjuster jam nut
2.20 FRONT AND REAR ISOLATORS, Front Isol-
ator
9.5-10.4 Nm
84-92 in-lbs
Clutch cable bracket
2.25 CLUTCH CONTROL, Assembly and Installa-
tion
4-12.2 Nm
36-108 in-lbs
Clutch cable fitting at primary
2.31 HANDLEBARS: FIREBOLT, Installation
6.8-9.5 Nm
60-84 in-lbs
Clutch hand lever fastener, Firebolt
2.32 HANDLEBARS: LIGHTNING AND ULYSSES
MODELS, Installation
6.8-9.5 Nm
60-84 in-lbs
Clutch hand lever fasteners
1.9 CLUTCH/TRANSMISSION/PRIMARY
FLUID, Inspection
9.5-12.2 Nm
84-108 in-lbs
Clutch inspection cover fasteners
1.9 CLUTCH/TRANSMISSION/PRIMARY
FLUID, Transmission Fluid
9.5-12.2 Nm
84-108 in-lbs
Clutch inspection cover fasteners
1.9 CLUTCH/TRANSMISSION/PRIMARY
FLUID, Adjustment
9.5-12.2 Nm
84-108 in-lbs
Clutch inspection cover fasteners
2.25 CLUTCH CONTROL, Assembly and Installa-
tion/Tighten in a crosswise pattern
9.5-12 Nm
84-108 in-lbs
Clutch inspection cover fasteners
5.3 PRIMARY COVER, Installation
9.5-12.2 Nm
84-108 in-lbs
Clutch inspection cover fasteners
5.4 CLUTCH RELEASE MECHANISM, Assembly
9.5-12.2 Nm
84-108 in-lbs
Clutch inspection cover fasteners
5.6 PRIMARY CHAIN, Installation/LOCTITE 271
(red) if using original mainshaft nut
67.8-81.3 Nm
50-60 ft-lbs
Clutch mainshaft nut
4.11 COOLING FAN, Installation
1.4-4 Nm
12-36 in-lbs
Cooling fan fasteners
6.26 MAIN WIRE HARNESS, Installation
1.4-4 Nm
12-36 in-lbs
Cooling fan fasteners
5.16 SHIFTER SHAFT, Installation/LOCTITE 271
(red)
44.7-50.2 Nm
33-37 ft-lbs
Countershaft retaining screw
5.15 TRANSMISSION INSTALLATION, Installing
Right Crankcase/Apply several drops of LOCTITE
271 (red) to last few threads.
20.3-25.8 Nm
15-19 ft-lbs
Crankcase 5/16 in. fasteners
3.18 CRANKCASE, Assembly/LOCTITE 272
20.3-25.8 Nm
15-19 ft-lbs
Crankcase 5/16 in. screws
6.23 CRANKSHAFT POSITION SENSOR
(CKP), Installation
9.0-11.3 Nm
80-100 in-lbs
Crank position sensor screw
3.7 CYLINDER HEAD, Cylinder Head Installa-
tion/Special procedure and pattern required for
tightening
17.6-20.3 Nm
13-15 ft-lbs
Cylinder head screws (final tightening)
3.7 CYLINDER HEAD, Cylinder Head Installa-
tion/Special procedure and pattern required for
tightening
17.6-20.3 Nm
13-15 ft-lbs
Cylinder head screws (final tightening)
3.7 CYLINDER HEAD, Cylinder Head Installa-
tion/Special procedure and pattern required for
tightening
10.8-13.6 Nm
96-120 in-lbs
Cylinder head screws (initial tightening)
3.7 CYLINDER HEAD, Cylinder Head Installa-
tion/Special procedure and pattern required for
tightening
10.8-13.6 Nm
96-120 in-lbs
Cylinder head screws (initial tightening)
XII TORQUE VALUES
Summary of Contents for XB 2010
Page 1: ...2010 Buell XB Models Service Manual 99490 10Y 2009 Buell Motorcycle Company ...
Page 4: ...Blank Text Here ...
Page 6: ...NOTES ...
Page 22: ...NOTES ...
Page 78: ...1 56 2010 XB Service Maintenance NOTES ...
Page 80: ...NOTES ...
Page 268: ...NOTES ...
Page 306: ...sm00134 Figure 3 46 Valve Spring Compressor HOME 3 38 2010 XB Service Engine ...
Page 338: ...sm00207 Figure 3 98 Flanged Oil Line HOME 3 70 2010 XB Service Engine ...
Page 364: ...3 96 2010 XB Service Engine NOTES ...
Page 366: ...NOTES ...
Page 410: ...4 44 2010 XB Service Fuel System NOTES ...
Page 412: ...NOTES ...
Page 472: ...5 60 2010 XB Service Drive Transmission NOTES ...
Page 474: ...NOTES ...
Page 488: ...sm00366 Figure 6 13 Boot Gap HOME 6 14 2010 XB Service Electrical ...
Page 570: ...6 96 2010 XB Service Electrical NOTES ...
Page 572: ...NOTES ...
Page 596: ...NOTES ...
Page 610: ......
Page 620: ...B 24 2010 XB Service Appendix B Wiring NOTES ...
Page 622: ...NOTES ...
Page 626: ...C 4 2010 XB Service Appendix C Conversions NOTES ...
Page 628: ...NOTES ...
Page 666: ...D 38 2010 XB Service Appendix D Hose and Wire Routing NOTES ...
Page 668: ...NOTES ...
Page 674: ...E 6 2010 XB Service Appendix E Active Intake Japanese Models NOTES ...
Page 675: ...TABLE OF CONTENTS SUBJECT PAGE NO F 1 GLOSSARY F 1 APPENDIX F GLOSSARY ...
Page 676: ...NOTES ...
Page 680: ...F 4 2010 XB Service Appendix F Glossary NOTES ...
Page 706: ...XXVI TORQUE VALUES NOTES ...