Service: Commissioning, 1, 2, 3, 4, 5, 6, 7 and 8
Page 19-16
Version 1.7
23 June 2015
STEP ACTION
27.
Assemble the knees and T pieces in the actuators.
28.
Check the openings in the 4 way block, in which you should replace the
actuators.
29.
Replace the metal ring at every actuator.
30.
Replace the actuators in the 4 way block.
31.
Replace the metal bracket and screw this tight.
32.
Reconnect the air tubes in the knees and T pieces.
Scheme 19-4 Replacing shutoff valves in actuators 4 way block