Page 25-34
Version 1.7
23 June 2015
25.14.
Checking pivot / steel cable
Steps
To check the pivot and steel cable, follow the
steps in
STEP ACTION
1.
Check the attachtool head with the robot arm.
Head is fully aligned (1) (see
) with the robot
arm.
Figure 25-34 Head aligned with robot arm
2.
Flap the head fully leftwards, using teach pendant.
Flaps the head leftwards or rightwards.
3.
Bolts are stainless steel.
NOTE
: if the bolt is not stainless steel, it should be replaced
by a stainless steel one.
4.
Figure 25-35 Bolts pivot
1
1
Summary of Contents for MR-D1
Page 1: ...Service Manual Original Service Manual Version 1 7 23 June 2015...
Page 8: ......
Page 10: ......
Page 30: ......
Page 50: ......
Page 74: ......
Page 102: ......
Page 126: ......
Page 140: ......
Page 142: ......
Page 170: ......
Page 182: ......
Page 192: ......
Page 206: ......
Page 224: ......
Page 312: ......
Page 342: ......
Page 416: ......
Page 436: ......