3–1
S E C T I O N 3
Installing Remote Keypads
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
In This Section
♦
General Information
♦
Keypads That May Be Used
♦
Wiring to the Keypads
♦
Mounting the Keypads
♦
Using a Supplementary Power Supply to Power
Additional Keypads
♦
Preliminary Checkout Procedure
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
General Information
This section lists the wired keypads that may be used and provides instructions for wiring
and mounting the keypads.
A preliminary checkout procedure is also provided to ensure that the connected keypads are
functioning properly in the system.
Keypads That May Be Used
• Fixed-Word Display: 6128
• Alpha Display: SK6139A-BAY
Up to 4 keypads may be used in the system,
independent of auxiliary power considerations
(you may need to use an auxiliary power supply if the 600mA aux. output is exceeded).
Be sure all keypads are set to the non-addressable mode (address 31).
Wiring to the Keypads
1. Determine wire gauge by referring to the Wiring Run Chart below.
For devices (keypads, RF receivers, zone expander, etc.) connected to a single 4-wire run,
determine the current drawn by all units connected to the single wire run, then refer to
the Wiring Run chart to determine the maximum wire length that can be safely used for
each wire size. Current draw for all devices can be found in
Section 26: Specifications
& Accessories
.
NOTE:
Refer to Table 1. AUXILIARY DEVICE CURRENT DRAW WORKSHEET in
Section 13: Final Power-Up
to obtain the current draw for all keypads.
MAXIMUM wire lengths for any device that is homerun to the control can also be determined from
the Wiring Run Chart, based on the current draw of that device
alone
.
Summary of Contents for Vista-20Bay
Page 2: ......
Page 22: ...VISTA 20BAY Installation Setup Guide 3 4 ...
Page 28: ...VISTA 20BAY Installation Setup Guide 4 6 ...
Page 32: ...VISTA 20BAY Installation Setup Guide 5 4 ...
Page 40: ...VISTA 20BAY Installation Setup Guide 6 8 ...
Page 64: ...VISTA 20BAY Installation Setup Guide 14 4 ...
Page 68: ...VISTA 20BAY Installation Setup Guide 15 4 ...
Page 82: ...VISTA 20BAY Installation Setup Guide 16 14 ...
Page 92: ...VISTA 20BAY Installation Setup Guide 17 10 ...
Page 98: ...VISTA 20BAY Installation Setup Guide 18 6 ...
Page 100: ...VISTA 20BAY Installation Setup Guide 19 2 ...
Page 110: ...VISTA 20BAY Installation Setup Guide 22 4 ...
Page 116: ...VISTA 20BAY Installation Setup Guide 23 6 ...
Page 122: ...VISTA 20BAY Installation Setup Guide 25 4 NOTES ...
Page 128: ...VISTA 20BAY Installation Setup Guide A 2 ...
Page 130: ...VISTA 20BAY Installation Setup Guide B 2 ...
Page 138: ... 1 9 l N7526 4V1 5 00 SINCE 1946 BAY ALARM 925 Ygnacio Valley Road Walnut Creek CA 94596 ...