Patch Cord/Jumper Installation And Administration
EQUIPMENT
ROOM
TWO POINTS
OF
ADMINISTRATION
SATELLITE
LOCATION
PURPLE
FIELD
WHITE
FIELD
WHITE
FIELD
BLUE
FIELD
INFORMATION
OUTLET
50
110P6A
PATCH
CORD OR
JUMPERS
95
9 5
110P6A
PATCH
CORD OR
JUMPERS
50
Figure 4-13. 2-Point Administration
To install a patch cord/jumper wire, proceed as follows:
1 .
2 .
3 .
4 .
5 .
6 .
At the blue or white field, locate the jack number associated with the
voice terminal location.
Connect one end of the patch cord/jumper wire to the
terminal/connecting block associated with this jack (see Note).
Note: An impact tool or 714B tool (for 66-type hardware
only) is required when installing jumper wires.
At the purple field, locate the port jack number identified on the Port
Assignment Record.
Route the previously connected patch cord/jumper wire to the
terminal/connecting block associated with the port jack.
Connect patch cord/jumper wire to the appropriate terminal on the
terminal/connecting block.
Update the Port Assignment Record (Figure 4-11).
4-21
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...