Equipment Room Hardware And Cabling Installation
Table 3-H. Auxiliary Lead Appearances at 66-Type Cross-Connect
Field (Contd)
66-Type
System
System
Z1A
574-5
Conn
75 Auxiliary
75 XE Auxiliary
Emerg
Power
Block
Connector
Connector
Xfr Unit
Xfr Unit
Term
Outputs
Outputs
Outputs
Outputs
35
36
Not Connected
TK
TK
37
GND
38
48
LC
LC
39
GND
40
ACC Power
Not Connected
ST
ST
-48
41
GND
TC
COM1
42
-48
N01
43
TK
NC2
44
NC1
45
Not Connected
Ext Alarm A
COM2
46
Ext Alarm B
LC
N02
47
Not Connected
ST
COM3
48
NC3
49
GRD
50
INADS
INADS
PWR
-48V
Installing Sneak Fuse Panels
The sneak fuse panel (Figure 2-18) must be installed as near as
possible to the network interface. To install the sneak fuse panel,
proceed as follows:
1.
2.
3.
4.
Hold the panel against the mounting surface and mark the upper
right and lower left mounting screw locations.
Drill pilot holes at the marked locations, and partially install the 3/4
inch No. 12 screws.
Slide the sneak fuse panel onto the mounting screws and tighten
the screws.
Repeat the procedure for each sneak fuse panel.
3-63
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...