CHAPTER 1. INTRODUCTION
CHAPTER 1. INTRODUCTION
General
This guide is one of the three documents (Figure 1-1) required to install
a System 75 or 75 XE switch. This guide describes the hardware, job
planning, equipment ordering, and installation information from:
●
●
The telephone company network interface up to and including the
25-pair cables that connect directly to the switch
The main equipment room cross-connect field and the associated
cabling from this cross-connect field to the switch cabinet and/or
8-pin modular wall jacks (information outlets).
All information in this guide is compatible with both System 75 or 75 XE,
except when a statement is made that a topic is strictly for a specific
switch.
The other documents required for the installation of the System 75 or 75
XE are as follows:
AT&T System 75—Installation and Test (555-200-104):
Contains the information required to install and test a System 75
switch and attendant console. For continuity purposes, the
attendant console wiring is covered in this guide.
AT&T System 75— XE Installation and Test (555-201-104):
Contains the information required to install and test a System 75
XE switch and attendant console. For continuity purposes, the
attendant console wiring is covered in this guide.
DEFINITY™ Communications System and System 75, and
System 85—Terminals and Adjuncts, Installation and Tests
(555-015-104)
Contains the information required to install and test
telephones/voice terminals and their associated adjuncts.
1-1
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...