CHAPTER 5. AUXILIARY EQUIPMENT INSTALLATION
Installing 3270 Data Modules
Requirements
The 3270 data module consists of a family of protocol converters that
allow terminals to communicate with a host computer through the
switch. The three types of 3270 data modules are:
●
●
●
3270A—asynchronous
3270C—controller
3270T—terminal.
The 3270 data modules are connected directly to TN754 digital line
circuit packs. This manual contains only the information required to
connect the data modules to the switch. Installation and testing
information for the data modules is contained in the 3270 DATA
MODULE—Coaxial-to-DCP Protocol Converter—Product Guide,
999-700-520.
lnstallation
Connection to 3270A or 3270T Data Module (Figure 5-19)
1.
2.
3.
4.
Determine port assignment of 3270A or 3270T Data Module from
Data Module Form:
EXAMPLE: Port Number
B
0 2
01
Carrier Slot Circuit
Connect a 4-pair line cord (modular plug on both ends) from the
information outlet to the data module (Figure 5-19).
Install patch cord/jumper wires at cross-connect field.
Administer per AT&T System 75 and System 75 XE—Implementation
( 5 5 5 - 2 0 0 - 6 5 1 ) a n d AT&T System 75 and System 75
XE—Administration (555-200-500).
5-33
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...