CHAPTER 3. EQUIPMENT ROOM DESIGN
Install connector cables between the auxiliary cabinet and cross-connect
field as follows;
1.
2.
3.
4.
5.
6.
7.
Install "D" rings on the wall between the cable slack manager and
the terminal/connecting blocks mounted on the cross-connect field.
Install a self-sticking port label on the back of each connector on
the B25A connector cable (Figure 3-43).
Note: Labels should be positioned so they will not be
obscured by the cabinet connector retainers.
At the rear of the auxiliary cabinet, connect one end of the
connector cable to the assigned connector.
Dress the cable down the back of the cabinet, and through the
cable slack manager to the cross-connect field.
At the cross-connect field, connect the other end of the cable to the
assigned terminal/connecting block connector.
Store the cable slack in the cable slack manager.
Repeat previous Steps 2 through 6 until all cables are instaIled.
Details for installing the equipment and making the connections to the
cross-connect field are included in Chapter.
Station Wiring Design
General
The following hardware and cabling is used in the station wiring design:
●
●
●
●
●
Adapters.
Labels
3-90
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...