CHAPTER 4. STATION WIRING
Patch Cord/Jumper Installation And
Administration
Before starting the patch cord installation, obtain a copy of the Port
Assignment Record forms (Figure 4-11) from the customer or marketing
representative. These forms contain the port assignments and identify
the extension numbers (Terminal No.) of the telephones/voice terminals.
Enter the jack assignments at the equipment room and indicate if
adjunct power is required and where it is provided (cross-connect field,
site/satellite closet, or information outlet).
When satellite locations are provided, enter the satellite letter
designation (A through F) and the jack appearance in the equipment
room on the form. Also, enter the floor designation and/or building
designation if appropriate. For 1-point administration (Figure 4-12), this
entry is all that is required. The white field number always corresponds
to the station jack number at the satellite location blue field.
For 2-point administration (Figure 4-13), the station jack numbers (blue
field) at the satellite locations must also be entered on the form. For
example, the entry A1-10 indicates satellite location A, white field
position 1 at the equipment room and the satellite location, and station
jack number 10 at the satellite location.
4-18
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...