Equipment Room Hardware And Cabling Installation
Installing Control Carrier Outputs Cable
The control carrier AUXILIARY connector outputs include the following:
●
●
●
●
●
Alarm monitoring for the AP and auxiliary cabinet
(7) dc power (-48 volts) sources for emergency transfer units
(3) dc power (-48 volts) sources for remotely powering two
attendant consoles and one executive voice terminal adjunct (not
provided on System 75 XE)
The INADS trunk connection location.
For the System 75 XE, access to a relay contact is available to
actuate a light, bell, or similar type customer-provided alarm
device. The relay can be administered to make contact when a
major, minor or warning alarm condition occurs in the switch. The
circuitry required for this feature must be provided by the
customer. The device connected to the alarm leads must not
exceed a rating of more than 100 volts at ¾ amps.
A 25-pair cable connects the control carrier AUXILIARY connector
(Figures 3-51 and 3-52) to a 66-type connecting block/110-type terminal
block in the yellow field of the trunk/auxiliary field.
3-75
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...