CHAPTER 4. STATION WIRING
CHAPTER 4. STATION WIRING
Hardware
Installation of Station Wiring And Associated
Installing Station Cables
The station labels shown in Figure 4-1 must be installed on each end of
a 25-pair station cable. The labels are provided with the 201A cabIe/jack
station labels (Figure 3-42). The labels must match the labels that were
previously installed at the cross-connect field. For example, if the cable
plugs into a 110-type terminal block/66-type connecting block connector
with jacks labeled 1 through 6, the cable label must be numbered 1
through 6 (see Note).
Note: If cable/jack station labels are not available, the information
can be written on the cable connector with a felt-tipped pen.
49-54
SIX 4-PAIR
CIRCUITS
BLUE
49-56
EIGHT 3-PAIR
CIRCUITS
Figure 4-1. 25-Pair Station Cable Labels
Install the station cables between the equipment room cross-connect
field and the site, satellite, or adapter locations. If 25-pair cables are run
from the equipment room to the satellite location, A25B (for 66-type
connecting blocks) or A25D (for 110-type terminal blocks) cables are
used. If multiple 25-pair staggered finger station cables (male to male)
are to be run from the equipment room to the satellite location, B25A
4-1
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...