CHAPTER 3. EQUIPMENT ROOM DESIGN
Port Labels (Purple)
PORT LABELS
The labels shown in Figure 3-35 identify the equipped carrier slots (see
Note) in the switch cabinet. These labels are grouped together (by
carriers) starting with Carrier A. These labels are used for the
trunk/auxiliary field, and the distribution field. They are installed starting
with the first terminal block in either field. The top label is grouped and
numbered in sequence 1A1 to 1A10 and 1B1 to 1B20 through 1E1 to
1E20 to correspond to the cabinet, carrier, and slot of the port circuit
pack. The bottom label must be filled in manually. It is used to label the
MET line circuit pack and the 16-port analog line circuit pack. An
example of how to fill out the label for the MET line circuit pack is shown
in Figure 3-36. An example of how to fill out the label for the 16-port
analog line circuit pack is shown in Figure 3-37. If WP-90929, List 1 or
3 concentrator cables are used to connect trunk or tie trunk circuits to
the switch, then use the labels shown in Figure 3-38 and 3-39 for these
circuits. Figure 3-40 shows an example of how to fill out a dual-purpose
emergency transfer station label.
Note: Equipped carrier slots are identified on the Customer
Service Order (CSO).
3-52
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...