Figures
Figure 4-11.
Figure 4-12.
Figure 4-13.
Figure 4-14.
Figure 4-15.
Figure 4-16.
Figure 4-20.
Figure 4-21.
Figure 4-22.
25-Pair Station Cable Labels
Multiple 25-Pair Station Cable With
Factory-Installed Staggered Fingers Connected to a
110-Type Terminal Block/66-Type Connecting
Block
Typical Satellite Location Layouts
3-Pair to 4-Pair Wiring Labeling From Equipment
Room to Information Outlet
4-Pair Station Wiring Labeling From Equipment
Room to Information Outlet
Typical Satellite Location Layout Equipped With
66-Type Connecting Blocks
Typical 8-Pin Modular Information Outlets
Remote Powering From the Equipment Room or
Satellite Location
Remote Powering From a 258A/356A Adapter in a
Site Closet
Typical Local Powering From a 400B2
Adapter—Flush/Surface-Mounted Information
Outlet
1-Point Administration
2-Point Administration
Connections for SAT
Connections for Attendant Console
Wiring Required at Cross-Connect Field for
Attendant Console Remotely Powered From Switch
Cabinet—System 75 Only
Selector Console Installation
Connections at Trunk/Auxiliary Field for INADS
Trunk
Connections for DS1 Tie Trunks Between Two
System 75 or 75 XEs
Connections Between DS1 Tie Trunk and T1 CSU
Connections For Off-Premises Stations
Connections for One to Eight Out-of-Building
Connections for Each Group of Eight
Out-of-Building Analog telephones
-iii-
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...