CHAPTER 3. EQUIPMENT ROOM DESIGN
APPARATUS MOUNTING FRAME ORDERING INFORMATION
Code Number
Description
Comcode
1110A2
Apparatus Mounting Frame 104 032 495
1110C1
Cable Support Assembly
104 175 120
1110A1
End Dress Panel
104 176 268
2110A1
Top Dress Panel
104 176 276
2110B1
Bottom Dress Panel
104 176 284
Wall Mounting 66-Type Connecting Blocks
The first column of 66-type connecting blocks should be aligned with
the left side of the switch cabinet (Figure 3-7). This arrangement allows
for orderly growth toward the right side of the cross-connect field.
The connectorized 66-type connecting blocks are factory wired for
cable routing from the top so that the cable connector will align with the
connector on the connecting block. If cable routing from the bottom is
desired, then the connector on the connecting block must be removed
and rotated 180 degrees. Then, the connector must be relocated in the
previously unoccupied hole because the connecting block leads are not
long enough to reach the hole where the connector was previously
mounted. The VELCRO® cable retainer must also be relocated.
To install the cross-connect field, proceed as follows:
1. Draw a level horizontal line on the wall 12 inches above the floor
* Registered trademark of VELCRO U.S.A. Inc..
3-30
Summary of Contents for System 75
Page 1: ...AT T AT T System 75 and System 75 XE Wiring...
Page 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Page 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Page 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Page 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Page 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Page 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Page 98: ...Typical System Equipment Room Floor Plans 3 15...
Page 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Page 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Page 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Page 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Page 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Page 212: ...Adjunct Powering 4 15...
Page 214: ...Adjunct Powering 4 17...
Page 216: ...Patch Cord Jumper Installation And Administration 4 19...
Page 241: ...CHAPTER 4 STATION WIRING 4 44...
Page 244: ...Miscellaneous Wiring Installation 4 47...
Page 246: ...Miscellaneous Wiring Installation 4 49...
Page 252: ...Miscellaneous Wiring Installation 4 55...
Page 254: ...Miscellaneous Wiring Installation 4 57...
Page 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Page 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...