C
2-10 ● SP-4430
2-3 Preparation for Measurement
Chapter 2 MEASUREMENT
2-3-1
Prepare necessary instruments as described in the following table before
starting Normal Measurement, Calibration by Magnetic Card or Calibration
by Calibrator.
Preparation
IMPORTANT
Take the Reagent Strips out of the refrigerator
and leave them at room temperature (10
〜
30
℃
) for 20 minutes.
Single Reagent Strips
Multi Reagent Strip
Using Reagent Strips without allowing
them to reach room temperature may
result in incorrect measurement results.
IMPORTANT
Summary of Contents for SPOTCHEM EZ SP-4430
Page 1: ...b SPOTCHEM EZ SP 4430 Operating Manual ...
Page 8: ...C 07 SP 4430 ...
Page 9: ...b ...
Page 25: ...C 1 16 SP 4430 ...
Page 26: ...b ...
Page 31: ...e SP 4430 2 05 1 4 装置の設置 Chapter 2 MEASUREMENT 2 1 4 校正について The flowchart of calibration ...
Page 70: ...C 2 44 SP 4430 ...
Page 71: ...b ...
Page 74: ...C SP 4430 3 03 1 4 装置の設置 Chapter 3 SUB MENU 1 4 3 設設置後の始動と終了 ...
Page 97: ...C 3 26 SP 4430 ...
Page 98: ...b ...
Page 117: ...b ...
Page 129: ...b 5 12 SP 4430 Chapter 5 TROUBLESHOOTING ...
Page 130: ...b ...
Page 139: ...b 83 00139F ...