1
8
Installation
8.1 Product Dimensions
Dimensions of 3U Models (mm)
8.2 Installing Rack Mount Handles
!
Caution!
The handles on the front side of the device are not for carrying!
Install the rack mount handles provide in the ship
kit on the power source before mounting the unit
in an instrument rack.
Refer to the illustration below for correct
assembly. The required screws are included
in the ship kit.
Installation
Dimensions of 6U Models (mm)
Calibration
Note:
The recommended range for low current range calibration point (IL) is from 2% to 18% rated
current, and for high current range calibration point (IH) is from 82% to 98% rated current.
7.3.4 Power Setting & Measurement Calibration
It is recommended to use calculated value (voltage times current) instead of Power meter
reading value due to the high current range.
Note
Use the touch keypad or [0]~[9] keys to enter user defined V-SET, I-SET and PL-SET.
Wait 5 seconds, move the cursor to PL-DPM field, then enter the power reading from the power
meter (use standard voltage reading times shunt current instead).
After pressing the Save soft key to save the first calibration coefficient, the PH-SET will become
available. Repeat the same process for PH calibration point.
Note:
The recommended range for low current range calibration point (PL) is from 2% to 18% rated
power, and for high current range calibration point (PH) is from 82% to 98% rated power.
7.3.5 Resistor Setting & Measurement Calibration
67
PROFESSIONAL
INNOVATIVE BRANDING
SERVICE
66
PROFESSIONAL
INNOVATIVE BRANDING
SERVICE
Apply or adjust the load to make sure that the power supply will work under CP mode.
483.0
133.0
30.0
36.0
423.0
65.0
65.0
700.0
801.0
483.0
265.0
97.0
36.0
30.0
740.0
882.0
423.0
86.0
106.0