![Amazone Cataya 3000 Special Operating Manual Download Page 187](http://html1.mh-extra.com/html/amazone/cataya-3000-special/cataya-3000-special_operating-manual_2919710187.webp)
Use of the implement
Cataya Special BAH0109-1 02.21
187
8. Rotate the bottom flap lever (Fig. 234/1)
across the group of holes (Fig. 234/2).
Open the bottom flaps.
The metered seed flows into the collection
bucket.
9. Set the bottom flap lever in the group of
holes (Fig. 234/2), like for the last seeding
operation, as soon as the collection bucket
is full.
Fig. 234
10. Empty the collection bucket (Fig. 235/1).
11. Repeat the procedure until the seed hopper
and the seed housing are empty.
Fig. 235
12. To empty the metering wheels, like for cali-
bration,
turn the central key to the left or
briefly run the seeding shaft drive mo-
tor, see "ISOBUS" operating manual.
Fig. 236
Then open the bottom flap lever and swivel it several times to remove
jammed seed on the bottom flaps.
Summary of Contents for Cataya 3000 Special
Page 2: ......
Page 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Page 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Page 241: ......
Page 242: ......