![Amazone Cataya 3000 Special Operating Manual Download Page 181](http://html1.mh-extra.com/html/amazone/cataya-3000-special/cataya-3000-special_operating-manual_2919710181.webp)
Use of the implement
Cataya Special BAH0109-1 02.21
181
10.6 During
operation
10.6.1 Overview of checks during operation
Time interval
Inspection
Chapter
Page
after the first 30 to 50 m travelled at
working speed have been covered
after changing from light to heavy
soil and vice-versa
after setting the coulter pressure
after readjusting the RoTeC depth
control discs/wheels
hourly,
e.g. each time the seed hopper is
refilled
after converting the WS coulters for
band seeding
Check the seed
placement
depth
RoTeC
8.6.1
8.9.1
153
158
TwinTeC
Special
Check the tillage intensity
of the exact following harrow
8.10 162
Summary of Contents for Cataya 3000 Special
Page 2: ......
Page 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Page 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Page 241: ......
Page 242: ......