Use of the implement
178
Cataya Special BAH0109-1 02.21
10.1 Initial
operation
Before initial commissioning
Check the hydraulic hose lines and couplings.
Section 12.3.2
Page 197
Check all the components of the hydraulic system for leaks
Check the oil level, in the Vario gearbox
Section 12.3.5
Page 200
After the first 10 operating hours
Check the hydraulic hose lines and couplings.
Section 12.3.2
Page 197
Check all the components of the hydraulic system for leaks
Check the chain tension
Section 12.3.3
Page 198
Check all bolted connections for tight fit
Section 12.8
Page 238
10.2 Work
floodlights
The work floodlights (Fig. 225/1) are switched
on the ISOBUS control terminal or
with a light switch on the power cable.
The power cable is inserted in 3-pin stand-
ard socket in the tractor cab.
Fig. 225
When transporting the implement on public roads, switch off the work
floodlights.
The connection of additional or non-approved floodlights can lead to
complete job computer failure and warranty loss!
Summary of Contents for Cataya 3000 Special
Page 2: ......
Page 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Page 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Page 241: ......
Page 242: ......