1. Connect 6mm gas pipe (14) into manifold (6) input. Make sure that there will
be no purging gas flow into system, until installation is complete and purging
controller is energized.
2. Connect short 6mm gas pipe (15) into manifold (6) output and GasEye receiver
enclosure (2) gas input with ATEX certified manometer (11) in between (using
6mm tee connector). Make sure that GasEye receiver gas inlets are not sealed
with plugs.
3. Install manifold control signal cable (9) into 6500 controller internal terminals
through one of the M12 glands.
Manifold (6) should be placed on the GasEye receiver side and connected
through 3x1mm
2
power cable (9) with purging controller (5) placed on the
GasEye central unit side. Length of the cable (9) should be less than 50m.
Wire number
6500 controller terminal
designation
1
Connect to grounding
screw
2
“DV -“
3
“DV +”
Table 59. Manifold control signal cable installation (system 6500).