Purging (non-ATEX)
196
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
1. Prior to the insertion of the tubings into the fittings please ensure that the
openings (red circles) are cleared and no object will interrupt the purge gas
flow.
Figure 192. Receiver unit – purging fittings.
2. Slide tubing into the receiver housing purge inlet and outlet. Yellow arrows
indicate purge gas flow direction.
Figure 193. Tubing connection – purge inlet and outlet.