![Airoptic GasEye User Manual Download Page 42](http://html1.mh-extra.com/html/airoptic/gaseye/gaseye_user-manual_2878696042.webp)
Installation
42
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
Housing lid opening
Central unit
1. Dismount housing lid of central unit by unscrewing each of the four bolts.
Please do it carefully since the lid has connection to boards inside the
housing.
2. Separate the lid out of the housing, until the end of wire hinges. Keep horizontal
direction (perpendicularly to front side).
Figure 39. Central unit housing lid bolts