Purging (non-ATEX)
200
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
Figure 196. Purging setup - receiver side (Option #2).
At this point the purging setup for the receiver side of the instrument is completed.
For the transmitter/central unit side of the instrument the purging setup is prepared in
similar way.
Option #2
Purge gas
source
Check
valve