ATEX (Zone 1 and 21 purging system
installation)
GasEye Cross Duct
Operating instructions, 05/2021
209
Zone 1/21 purging system
Purging system consist of three parts: purging controller, manifold and a vent. The
main parts of the purging system are shown in figure and table below.
Figure 200. Purging system drawings.
ID
Name
P1
Cable gland M16
P2
PE connector
P3
Plug M12
P4
Cable gland M12
P5
Purging controller
P6
Vent
P7
Vent electrical connector
P8
PE connector
P9
Vent enclosure
P10
Purging gas connector
P11
Purging gas connector
P12
Manifold
P13
Manifold needle valve
P14
Manifold electrical connector
Figure 201. Descriptions of purging system parts.
Zone 1 and 21 purging system installation with GasEye Cross
Duct Single Gas