ATEX (Zone 1 and 21 purging system
installation)
202
GasEye Cross Duct SG and MG
Operating instructions, 05/2021
WARNING
Never install GasEye Cross Duct system in the ATEX zone without permission of
the plant manager (hot work permit).
Death, personal injury and/or damage to property may result if this is not complied.
WARNING
Observe the specifications of the examination certificate valid in your country.
Observe the laws and regulations valid in your country for the electric installation in
hazardous areas with risk of explosion. Regulations for installation of electric
equipment in hazardous areas: DIN EN 60079-14.
WARNING
Never switch on or operate an analyzer with lid open.
Before opening the device wait at least two minutes after de-energizing.
Make sure that externally powered signals are also be de-energized. For secure
disconnection of all signals the device should be operated in hazardous areas only
via a switch-off unit placed outside the hazardous area.
WARNING
Never repair the device on site!
Any components not mentioned in the spare parts list must be replaced or repaired
by certified field service technicians. Failure to do so will also result in loss of Ex
approval.
WARNING
The use of the alignment kit for aligning the sensors is not covered by the ATEX
certificate.
Never use the kit in the ATEX zone without permission of the plant manager (hot
work permit).
Information about possible ATEX use you will find on a label located on enclosure of
the device.