Installation
GasEye Cross Duct
Operating instructions, 05/2021
29
3. Mount flange on the process flange with another graphite gasket between
flange and purging tube.
Figure 18. ETC - mounting flange on the process flange.
4. Screw on M12 nuts with pads and tighten them with 8mm hex key and 19mm
wrench. Nuts should be tightened with similar torque (around 60-70Nm) to
nsure good sealing on the gaskets.
Figure 19. ETC - Nuts mounting.