Page
22
of
92
4.2.3 TC-PM Torque Control Pulse Monitor
Control strategy uses torque as the only control parameter. The tool stops when Torque Target is
reached. Rundown is considered to be successful (Accept) if the stage peak torque value falls
within the range specified by the Torque High Limit and the Torque Low Limit parameters.
Enter approriate values in Edit stage Screen
Torque High:
Upper control limit of the rundown
Torque Target:
Final desired torque (CUT Level)
Torque Low:
The lower control limit of the rundown
Pulse Bailout:
If the the number of pulses exceeds this
value the tool will stop and the rundown will
terminate
Pulse High:
Maximum acceptable pulses
Pulse Low:
Minimum acceptable pulses
Additional Pulses:
After reaching target torque,
additional pulses to be applied before shutting of the
tool
Once the desired stage configured, press
to save stage and again to save the
PSet
and
return to initial PSet menu.
Next Press
to go to the
RUN
screen or
to return to the
Home
page. The tool should now
be operational and you are ready to run a configured PSet.