![Abicor Binzel iROB 501 PRO Original Operating Instructions Download Page 90](http://html2.mh-extra.com/html/abicor-binzel/irob-501-pro/irob-501-pro_original-operating-instructions_5036310090.webp)
EN
-
90
9 Maintenance and cleaning
iROB
®
501 PRO
9.5.4 Replacing the pressure roll
1
Disconnect the Pull Feeder KINETIC from the power supply.
2
Open the front cover
3
4
Loosen the hexagon socket screws
(2×) and remove the cover plate
.
5
Remove the locking ring
.
6
7
and attach in the reverse order.
Fig. 48
Replacing the pressure roll
A
Locking ring
B
Pressure roll
C
Front cover
D
Pressure lever
E
Pressure lever hook
F
Cover plate
G
2× hexagon socket screws
G
E
D
F
B
A
C