circuit breaker is closed. Information about the circuit breaker position is connected to
the
FF_CBCLOSED
input.
There are two conditions for activating the current and voltage delta function.
•
The magnitude of dU/dt exceeds the corresponding value of the
Voltage Change
Rate
setting and the magnitude of dI/dt is below the value of the
Current Change
Rate
setting in any phase at the same time due to the closure of the circuit breaker
(
FF_CBCLOSED
= TRUE).
•
The magnitude of dU/dt exceeds the value of the
Voltage Change Rate
setting and
the magnitude of dI/dt is below the
Current Change Rate
setting in any phase at
the same time and the magnitude of the phase current in the same phase exceeds
the
Min Op Current Delta
setting.
The first condition requires the delta criterion to be fulfilled in any phase at the same
time as the circuit breaker is closed. Opening the circuit breaker at one end and
energizing the line from the other end onto a fault could lead to an improper operation
of SEQSPVC with an open breaker. If this is considered to be an important
disadvantage, the
FF_CBCLOSED
input is to be connected to FALSE. In this way
only the second criterion can activate the delta function.
The second condition requires the delta criterion to be fulfilled in one phase together
with a high current for the same phase. The measured phase current is used to reduce
the risk of a false fuse failure detection. If the current on the protected line is low, a
voltage drop in the system (not caused by the fuse failure) is not followed by a current
change and a false fuse failure can occur. To prevent this, the minimum phase current
criterion is checked.
The fuse failure detection is active until the voltages return above the
Min Op Voltage
Delta
setting. If a voltage in a phase is below the
Min Op Voltage Delta
setting, a new
fuse failure detection for that phase is not possible until the voltage returns above the
setting value.
Decision logic
The fuse failure detection output
FUSEF_U
is controlled according to the detection
criteria or external signals.
1MRS757488 H
Section 6
Commissioning
RIO600
141
Installation and Commissioning Manual
Summary of Contents for Remote I/O RIO600
Page 1: ... Remote I O RIO600 Installation and Commissioning Manual ...
Page 2: ......
Page 8: ......
Page 14: ...6 ...
Page 18: ...10 ...
Page 64: ...56 ...
Page 280: ...272 ...
Page 306: ...298 ...
Page 310: ...302 ...
Page 311: ...303 ...