Page 3–4
2101510 Rev. AG
P
ip
e
M
o
u
n
t
F
re
e
-S
ta
n
d
in
g
W
a
ll S
he
lf
E
NC8
2
L
E
NC8
2
S
Installation Instructions
Se
c
ti
o
n
•
ENC82L Optional Pwr/Comm Outlet Box Assembly
2.16
•
•
•
Carrier/Calibration Bottle Rack Installation on Meter Run
2.17
•
•
ENC82 Carrier Gas Bottle Rack Installation
2.18
•
•
•
•
•
Carrier Gas Regulator Installation
2.19
•
ENC82L Calibration Gas Bottle Installation
2.20
•
ENC82S Calibration Gas Bottle Installation
2.21
•
•
•
•
•
Calibration Gas Regulator Installation
2.22
•
•
•
•
•
Carrier Gas and Calibration Gas Connections
2.23
•
•
•
•
•
Vent Lines Connections
2.24
•
ENC82L Optional Catalytic Heater Installation
2.25
•
ENC82S Optional Catalytic Heater Installation
2.26
•
•
ENC82 Optional Electric Heater Installation
2.27
•
•
Sealing Environmental Enclosure
2.28
•
•
•
•
•
Optional Equipment Enclosure Installation
2.29
•
•
•
•
•
115/230 VAC UPS Power Supply (24 VDC Systems)
2.30
•
•
•
•
•
115/230 VAC to 12 VDC Explosion-Proof Power Supply
2.31
•
•
•
•
•
110/240 VAC to 12/24 VDC Power Supply
2.32
•
•
•
•
•
24 VDC to 12 VDC Power Converter
2.33
•
•
•
•
•
Battery Pack Installation
2.34
•
•
•
•
•
Solar Panel Installation
2.35
•
•
•
•
•
Solar Power Pack
2.36
•
•
•
•
•
DC Power Installation
2.37
•
•
•
•
•
Remote Communication Installation
2.38
3.2 Unpacking and Inspection
3.2.1
Shipping Carton
Ensure that there is no external damage to the shipping container. If there is
visible external damage, contact the receiving group and report the damage to the
trucking company for a freight damage claim.